Finally, the finish work is really happening!
Quite a lot of the base for the stair rails was laid today.
And the baseboard is being placed with all due speed.
And here are some signs of things to come.
Tuesday, December 15, 2009
Day 64 - 12/11
We came home to see the door barred after a weekend away (well, taped more than barred I suppose).
Inside the house, the floors had been refinished. This is just the stain coat, the varnish will come later. I can't even tell where the old walls were, much less the floor patches. Everything looks beautiful.
Inside the house, the floors had been refinished. This is just the stain coat, the varnish will come later. I can't even tell where the old walls were, much less the floor patches. Everything looks beautiful.
Sunday, December 13, 2009
Day 62 - 12/09
Getting repetetive here... More windows were trimmed out.
The glass block window finally arrived and was set in the small bathroom!
The glass block window finally arrived and was set in the small bathroom!
Day 61 - 12/08
More doors were set.
All of them are now set and trimmed out, and the window trim was begun.
The floors were patched in preparation for the floor finishing that will happen later this week.
All of them are now set and trimmed out, and the window trim was begun.
The floors were patched in preparation for the floor finishing that will happen later this week.