Doors are here and framed up, ready for placement.
The siding on the west side is still being placed.
And the tiling continues.
Saturday, December 12, 2009
Day 57 - 12/02
The siding is mostly completed on the south side of the house, the only thing left is the top of the chase, it will not be completed until the final inspection on the chimney inside.
The vanities arrive, here's a shot of the small bathroom vanity.
And here's the master bath. It's actually two 36 inch vanities that will be attached to one another.
The small bathroom vanity top was also here when we got home.
Here's a look at the continuing tiling happening in the small bathroom as well.
The vanities arrive, here's a shot of the small bathroom vanity.
And here's the master bath. It's actually two 36 inch vanities that will be attached to one another.
The small bathroom vanity top was also here when we got home.
Here's a look at the continuing tiling happening in the small bathroom as well.
Day 55 - 11/30
More of the siding was completed.
The garage shingles arrived! This will be one of the last priorities. The garage (siding and roofing) can be completed log after everything on the inside so you won't see this finished for a while.
And on the inside, the master bath floor is grouted and ready for cabinets and a toilet.
And we started the tiling of the walls in the small bathroom.
The garage shingles arrived! This will be one of the last priorities. The garage (siding and roofing) can be completed log after everything on the inside so you won't see this finished for a while.
And on the inside, the master bath floor is grouted and ready for cabinets and a toilet.
And we started the tiling of the walls in the small bathroom.
Sunday, November 29, 2009
Days 52-54 - 11/26 through 11/28
These few days are kind of a blur and we don't have a lot of pictures. The painting is near complete. Here's a shot of the master bedroom. Steph has been working feverishly on the painting (thanks again to Ryan and Lisa for showing up AGAIN to continue to help us out). Andy has continued to do miscellaneous work (sanding sheetrock fixing random devices, cleanup) along with more tile work.
The master bath floor was laid and is ready to be grouted.
The tub surround still hasn't been backed because there is no tub drain. Until we're certain that they can get a drain in there with the surround placed I'm going to leave it open.
The small bathroom floor is grouted and the bullnose is placed (neither pictured) and the wall is about 1/3 of the way complete. This is a pinwheel pattern using 4" and 12" tile and it's really coming along nicely.
The master bath floor was laid and is ready to be grouted.
The tub surround still hasn't been backed because there is no tub drain. Until we're certain that they can get a drain in there with the surround placed I'm going to leave it open.
The small bathroom floor is grouted and the bullnose is placed (neither pictured) and the wall is about 1/3 of the way complete. This is a pinwheel pattern using 4" and 12" tile and it's really coming along nicely.
Day 51 - 11/25
Alex began painting her room!
With a pink ceiling and a purple walls this is definitely a little girl's room.
The 2nd bedroom is very green!
The master closet is now tile cutting central. The great thing about this saw is that the price dropped by $60 for black Friday so we were able to take advantage of the Home Depot's price protection and save some dough!
The small bathroom floor is completely laid.
The full tiles were laid in the master bath to provide points of reference for the imposing number of cuts that will be necessary to set the tiles at 45 degrees.