Friday, October 23, 2009

Day 23 - 10/22

The header was placed at the front of the porch and then the temporary supports were put back in place. 

The temporary wall was removed from the upstairs and the size has really become apparent.




And the plumbing was roughed in.  Here's the upstairs...



Here's the flow through to the waste pipe (inside the kitchen wall)...

And here is where the new plumbing attaches to the waste pipe.