Since the rain is stopping all of the work on the upstairs, demo begins downstairs! The wall between the red and blue bedrooms is removed, so are the closets and the sheetrock on the front walls. New sheetrock will be placed on the front wall; this is more of the fortification efforts that must be performed to accomodate our unorthodox design. Check out all of the red and clue sheetrock in the dumpster!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment