The tarp came off because the shingles arrived and the roof was finally finished (with the exception of gutters, soffits, fascia...).
The heating rough in was finished, including a chimney that vents outside!
Quite a lot of the electrical was done. Unfortunately quite a lot will also be re-done, like these switches that were placed behind the front door. Other than those types of changes the first floor is wired and ready to go.
The wood floors were removed from the dining room. Initially we were going to place oak in the old kitchen as well so we'd have the wood floors flowing throughout the first floor, but we changed our tune when we started to consider the durability of tile by the often used back door.
No comments:
Post a Comment