The floors were glued today! Everything is tacked down and ready for interior walls.
In addition to that the framing around the chimney and cold air return for the upstairs was placed.
And the headroom for the staircase was established.
Since we're working with an existing structure and trying to keep the walls upstairs and down in position to give us maximum hallway space. As a result, the stairs will land and there will be a bit of a cut-out in the upstairs floor plan to create headroom above the first 2 stairs below the landing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment