Most of the siding was placed on the north side of the house.


The front door was placed as well.  With a couple of problems...


If you look closely you may see that the doorframe is wider at the top than the bottom.  In addition to that issue, the door is not plumb with the frame.  We've filed a complaint with the manufacturer, but don't know when and if a new door will arrive.


Of course the painting continues.  Here is the ceiling in the 2nd bedroom upstairs.



And the bathrooms each received a final coat of paint.  Now the backer can be placed and the tiling can start.  This is a shot of the master bath.  The closet to the right will be a bathroom linen and storage closet.