Day 39 - 11/13

A massive delivery of sheetrock arrived!  5/8 for the upstairs ceilings and the kitchen, 1/2 for all the walls and 3/8 to cover the downstairs ceilings.  With all the moving of walls and changing and things falling into the downstairs from up (via holes in the sheetrock...) there was just too much repair to do and the easiest and least expensive thing was to cover the old ceilings.







The garage was prepped for insulation as well.