Sunday, November 29, 2009

Days 52-54 - 11/26 through 11/28

These few days are kind of a blur and we don't have a lot of pictures.  The painting is near complete.  Here's a shot of the master bedroom.  Steph has been working feverishly on the painting (thanks again to Ryan and Lisa for showing up AGAIN to continue to help us out).  Andy has continued to do miscellaneous work (sanding sheetrock fixing random devices, cleanup) along with more tile work.



The master bath floor was laid and is ready to be grouted.


The tub surround still hasn't been backed because there is no tub drain.  Until we're certain that they can get a drain in there with the surround placed I'm going to leave it open.

The small bathroom floor is grouted and the bullnose is placed (neither pictured) and the wall is about 1/3 of the way complete.  This is a pinwheel pattern using 4" and 12" tile and it's really coming along nicely.

No comments:

Post a Comment