Sunday, November 15, 2009

Day 40/41 - 11/14 through 11/15




Andy did a lot of work over the weekend repairing and re-inforcing the subfloor.  The first step was to replace some of the old planks.




If you're wondering why they needed to be replaced, check out these shots.


At one point, there were carpenter ants in this house.  And they ate some of the planking.  With the rotten boards out and new ones laid on saturday, Sunday was the day for laying some plywood subfloor on top of the planks.


This is 1/4 inch plywood.  It will be covered with 1/4 inch tile board, and then the tile can be placed on top of that.  The thin ply and tilebacker will mean that the tile won't rise too far above 3/4 floorboards.